BALLAST WATER TREATMENT SYSTEM IMPLEMENTATION
Client requests are turnkey solution with covering of all Class and Regulatory needs.
Read moreEstablish the right level of maintenance to ensure cost effective, reliable and safe operation of the equipment:
Our Maintenance Engineering team follows all the certified process to run this RCM study: data collection, Operational Context documentation, FMEA study, Cost/Benefit analysis.
Then the final review of the RCM maintenance plan with the Customer for approval takes place, and optimization of vessel maintenance plan in PMS as result.
One year later, we can also run a return on experience study (Retex), to check if expected savings are not far from reality.
12
optimized maintenance plans
78 400 USD per vessel
EXPECTED SAVING
FOR 10 YEARS
10%
FAILURE RATE DECREASING
Client requests are turnkey solution with covering of all Class and Regulatory needs.
Read moreClient requests accurate control of docking project costs, optimizing the ressources.
Read moreImplementation of Vibration Monitoring Solution on Client vessel.
Read more